Chevron 2 and 8.5
Jan 22, 2019
Project Type: PV rated at 10.5 MW (Aggregated) Location: Richmond, CA EPC: Cenergy Power Products/Services: SCADA, revenue meters, MET stations,…
Expert insight helps lower your risk and reduce costs -- a direct benefit to your bottom line.
Better for the Owner! Better for the Integrator! Better for the Grid!
End-to-end guidance from experts who have guided over 900 resources to successful grid connection.
The Trimark Operations Center (TOC) helps you maintain compliance and ensure accurate data.
A Comprehensive Training Ecosystem for Power Industry Professionals
Trimarkl's OCC delivers NERC-compliant monitoring, alarm response, dispatch, and failover capabilities.
We've got you covered with Services from concept to commissioning and Products from panel to the point of interconnect.
Deploy a comprehensive ISO compliance package to participate in the market.
If you’re navigating the requirements to connect to the electric grid, Trimark is here to help.
To connect resources to CAISO’s control grid, owners must follow CAISO’s New Resource Implementation (NRI) process, install a Remote Intelligent Gateway (RIG), acquire an Energy Communications Network (ECN) connection, and install a CAISO-certified Revenue Meter. Trimark provides complete solutions to help you meet CAISO’s requirements on time and in compliance.
To participate in CAISO’s markets, resources must follow CAISO’s New Resource Implementation (NRI) process and schedule. That’s the formal process that ensures compliance with the CAISO Tarrif.

Trimark has guided over 900 resources through CAISO’s NRI process. We help you understand what’s required, meet CAISO’s strict deadlines, and work with you to make your project successful.
Our turnkey solutions typically pair NRI services with certified metering, RIGs, design package, equipment cabinets, installation, point-to-point testing, certification, and support for ongoing compliance.
I need guidance through the NRI!
Trimark’s RIG fulfills CAISO’s requirement for realtime data-telemetry. Requirements include:
Who do you trust with millions in revenue at stake?
Trimark delivers metering solutions for revenue settlements, incentive programs, and renewable energy credits (RECs).

Trimark’s team includes metering engineers, CAISO-certified meter inspectors, and experienced project managers. We design your metering schemes and networks, procure equipment, configure meters, fabricate cabinets and panels, install meters in the field, connect meters to your CT/PTs, test accuracy and communications, support point-to-point testing, form submittal, then inspect and seal the installation – resulting in a CAISO-certified meter.
To participate in CAISO’s markets, resources must follow CAISO’s New Resource Implementation (NRI) process and schedule. That’s the formal process that ensures compliance with the CAISO Tarrif.

Trimark has guided over 900 resources through CAISO’s NRI process. We help you understand what’s required, meet CAISO’s strict deadlines, and work with you to make your project successful.
Our turnkey solutions typically pair NRI services with certified metering, RIGs, design package, equipment cabinets, installation, point-to-point testing, certification, and support for ongoing compliance.
I need guidance through the NRI!
Trimark’s RIG fulfills CAISO’s requirement for realtime data-telemetry. Requirements include:
Who do you trust with millions in revenue at stake?
Trimark delivers metering solutions for revenue settlements, incentive programs, and renewable energy credits (RECs).

Trimark’s team includes metering engineers, CAISO-certified meter inspectors, and experienced project managers. We design your metering schemes and networks, procure equipment, configure meters, fabricate cabinets and panels, install meters in the field, connect meters to your CT/PTs, test accuracy and communications, support point-to-point testing, form submittal, then inspect and seal the installation – resulting in a CAISO-certified meter.
Last summer when temperatures topped 117 degrees and power demand reached a record 52 GW, California faced a real threat of blackouts. Our team worked nights and weekends to commission SCADA to control two BESS resources that added 227 MW of critical reserves just in time to help avoid a crisis.
I develop control software that simplifies the operation of utility-scale solar power generation and energy storage. That’s key to making renewable energy stable, reliable, and viable – which is how we’ll save the world.
The systems we design are a small, but critical, part of power generation. We design the ‘brains’ that monitor and control each resource to be reliable and durable – in some very tough environments. I’m proud to do my part to leave a lasting benefit for society.

Resource owners want to reduce risk, avoid penalties, and maximize revenue. My role is to help customers gain peace of mind and operate confidently in accomplishing their mission.

Over the last 20 years, we’ve helped over 900 resources navigate CAISO’s NRI. With owners building more utility-scale renewable generation nationwide they’re now asking Trimark to help them comply with PPA and interconnection requirements in ERCOT, MISO, ISO New England, NYSERDA – really anywhere that complex agreements require expert advice.
Project Type: PV rated at 10.5 MW (Aggregated) Location: Richmond, CA EPC: Cenergy Power Products/Services: SCADA, revenue meters, MET stations,…
Project Type: PV generating facilities – 39 sites Location: Throughout CA with one site in AZ Client/EPC: 39 customers Products/Services:…
Location: 28 Projects throughout the United States EPC: Multiple EPCs including Swinerton Renewable Energy, Rosendin Electric, Signal Energy, Cupertino Electric,…
Big Sky North Project Type: PV rated at 105 MW Location: Lancaster, CA in LA County EPC: Rosendin Electric, Inc….
Need a SCADA system that optimizes revenue? Need help meeting interconnection requirements? Want to stay in the market and avoid fines? Weʼve got you!